Submissions in response to hydraulic modelling
The Queensland Floods Commission of Inquiry invited submissions in response to the following hydraulic modelling reports:
- Joint Calibration of a Hydrologic and Hydrodynamic Model of the Lower Brisbane River – Technical Report, prepared by Sinclair Knight Merz (SKM)
- Review of Hydraulic Modelling – Final Report, prepared by Mark Babister and others at WMAwater.
The SKM report describes modelling work carried out for Seqwater. (Note Version 3 of the SKM report, dated 5 August 2011, is published here.)
The Commission engaged Mr Babister to review the SKM modelling. The Commission received and published the final version of the WMAwater report on 28 July 2011.
Submissions addressing the hydraulic modelling reports were to be provided to the Commission no later than 1 September 2011.